Automatic Train Control System

ATC Visualization

Your Advantages

  • Visualisation via a Supervisory Control- and Data Acquisition System (SCADA)
  • Showing geographical representation of guide way, stations, track switch, transfer tables, depot etc.
  • Physical position and status of trains
  • Identification of train
  • Status track switch and transfer table
  • Operation mode and status of selected equipment
  • Status of each station as platform doors, fire alert
  • Status power feeding

 

The Automatic Train Control System of Intamin allows a driverless and save operation of the trains, only monitored from a Central Control Room.  With a high automation degree of the system, the operation costs will be low, leading into a superior profitability of the transport line.

Ashgabat

Modern Public Transport and landmark at the Olympic site in Ashgabat

learn more

Get in touch with us

Contact Information

If you need more information about our Monorails or want to talk about your project please fill free to contact us today!

Landstrasse 126
P.O. Box 309 - 9494 Schaan
Liechtenstein

+423 237 03 63

info@intamin.com

Cookie Settings

Listed here are all the cookies used for our marketing purposes.
Google Analytics (cn_AnalyticsActive)
Used to send data to Google Analytics about the visitor's device and behaviour. Tracks the visitor across devices and marketing channels.